Projects Executed
Download Profile
Akre Emergency Hospital – Construction of a New Operating Block
In 2021, 4 Stin Construction executed the construction of a new Operating Block at Akre Emergency Hospital, addressing the urgent need for modern surgical infrastructure. The block was designed with multiple operating theatres, pre- and post-operative rooms, and sterile zones, enabling the hospital to perform a higher volume and range of surgical procedures.
- Surgical case handling increased due to expanded and upgraded facilities.
- The design improved infection control and safety in operating environments.
- The project reduced referral rates to external facilities, easing patient transfers.
With a focus on hygiene, patient flow, and surgical efficiency, the construction was completed using high-grade materials and in compliance with health facility standards. The new block has since played a vital role in reducing surgical wait times and improving outcomes for emergency and elective procedures.